Installation inspection of stainless steel meter box wire

a. The current carrying capacity of conductor section shall comply with the standard;

b. When connecting the main circuit components with insulated conductor, the C. crimping terminal of DT standard shall be adopted, and the phase sequence color code shall meet the requirements;

Wiring shall comply with the requirements of process documents, neat and beautiful, firm and reliable;

f. Insulated conductor shall not be laid on conductive parts and shall be protected when passing through metal components;

d. There should be no joint between the connecting wires between the two electrical components;

e. Electrical clearance and creepage distance

The electrical clearance should be ≮ 5.5mm, and the creepage distance should be ≮ 6.3mm

Recent News
Recommend Products
Food Paper Bags RFID Seal Cable Seal TWS Wireless Earbuds Sanitary Butterfly Valve Sanitary Ball Valve Insulated Piercing Connector Rigid Box Machine Rigid Box Machine Small Size Ball Valve Bolt Seal Flexible Copper Braided Wires 1PC BALL VALVE Sanitary Centrifugal Pump Acetate Optical Frames Sanitary Butterfly Valve 卫生离心泵 卫生离心泵 Anti Corrosion Pipe Supports Straw Paper Machine