Blog

Power On Operation Test Of Stainless Steel Meter Box

Publish Time: Author: Site Editor Visit: 433

Power on operation test of stainless steel meter box

a. Before the test, it is necessary to carefully check the internal wiring of the meter box to meet the electrical schematic diagram, confirm that all wiring is correct and the insulation resistance meets the requirements before conducting the power on test;

b. After the components are powered on, the voltage at the outlet end shall be correct;

c. There is no jamming and overload phenomenon in the opening and closing test of the electrical component switch;

d. For leakage type components, the start test button should have protection action phenomenon;

e. Confirm that all outgoing lines, switches and meter connections are corresponding, and can not be confused or misplaced.

Recent News
Recommend Products
Food Paper Bags RFID Seal Cable Seal TWS Wireless Earbuds Sanitary Butterfly Valve Sanitary Ball Valve Insulated Piercing Connector Rigid Box Machine Rigid Box Machine Small Size Ball Valve Bolt Seal Flexible Copper Braided Wires 1PC BALL VALVE Sanitary Centrifugal Pump Acetate Optical Frames Sanitary Butterfly Valve 卫生离心泵 卫生离心泵 Anti Corrosion Pipe Supports Straw Paper Machine